Building Renewal Grant: Procurement Phase Grant

This Phase Grant is specifically intended for securing funding for Procurement Services assistance needed in order for a school district to conduct public bidding and in preparation to submit the future BRG Construction Phase Grant application.  

This Phase Grant does not include funding for costs associated with Assessment, Design, Construction Lite or Construction services; districts should apply separately for these types of BRG Phase Grants if funds are needed or consult with their SFD Liaison for additional technical guidance. 

 

When To Apply:

After an assessment has been completed and a scope of work has been determined through the Scope Development process, a design has been prepared, the design has been approved by SFD staff, and procurement services are now needed.  


Eligibility: 

  • To qualify an Arizona School District must meet Title 41, Chapter 56
  • Ability to provide the following: 
    • a proposal/quote for completion of the procurement services 


Next Steps:

After the Assessment Phase Grant is completed (if applicable), after the Design Phase Grant is completed (if applicable), and the Procurement Phase Grant is completed (if applicable), the Construction Phase Grant will be released to the District and the District will be prompted to submit a Construction Phase Grant application.

Document Type